Projet de travail approuvé
ISO/AWI 22083
Titre manque
Numéro de référence
ISO/AWI 22083
Edition 1
Projet de travail approuvé
ISO/AWI 22083
87787
Un groupe de travail a préparé un projet.

Résumé

In order to reduce the impact of predictable natural hazards on railway operation, this document specifies a general concept and basic requirements for the planning of railway operation in the events of predictable natural hazards, focusing on rainfall and strong wind. The given concepts and basic requirements do not apply to regions where the consequences of the addressed predictable hazards for railway operation are low or non-existent. The definition of such regions is out of the scope of this document.

This document includes measures directly related to railway operation to reduce the impact in the events of predictable natural hazards. Furthermore, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

Informations générales

  •  : Projet
    : Nouveau projet enregistré au programme de travail du TC/SC [20.00]
  •  : 1
  • ISO/TC 269/SC 3
  • RSS mises à jour

Vous avez une question?

Consulter notre Aide et assistance